SAP calculations for new builds, extensions and property conversions. Design-stage and as-built assessments, with straightforward quotations and support for Building Control requirements.
SAP, the Standard Assessment Procedure, is the government method for calculating the energy performance of a dwelling. Building Control uses it to check that new homes, and buildings converted into homes, meet Part L of the Building Regulations: the conservation of fuel and power.
The calculation models the walls, floors, roof, windows, heating, hot water, ventilation and any renewables, then compares the result with the targets the dwelling must meet. Done at design stage, it tells you about problems while they are still a change to a drawing rather than a change on site.
We work for architects, architectural technologists, developers, builders and self-builders, from single plots and extensions to small developments.
Get a Fixed Quote
Each service is scoped from your drawings, so you only pay for what your project needs.
Houses, bungalows and flats, from a single self-build plot to a small development. Every new dwelling needs its own calculation.
Produced before work starts for your Building Control submission, with a Predicted Energy Assessment and clear notes on what the design relies on.
Updated at completion with the final specification and air test result, then the On-Construction EPC is lodged for sign-off.
If a design is close to failing, we model the options (fabric, glazing, heating, ventilation, PV) and show the most cost-effective fix.
For extensions with more windows, roof lights or glazed doors than the standard allowance, we show the extended home still meets Part L.
Barn conversions, commercial-to-residential and houses split into flats, where new dwellings need a SAP-based EPC on completion.
Plot-by-plot calculations, consistent specifications across house types and as-built updates as each plot completes.
We check the build-ups on your drawings and tell you early if a wall, floor or roof needs a separate U-value calculation.
Not every project needs SAP. This is the usual position. Your Building Control body has the final say, and we will confirm before you commit to anything.
SAP runs alongside your project in two stages, so the final paperwork matches what was actually built.
Plans, elevations, sections and whatever specification you have. We review them and confirm a fixed price, timescale and any missing information.
We model the design and issue the design-stage calculation and Predicted Energy Assessment for Building Control. If it falls short, we show you what to change.
If anything changes on site, such as insulation, windows or the heating system, tell us and we'll check it still complies before it's installed.
On completion we update the calculation with the final details and air test result, lodge the On-Construction EPC and send the documents Building Control needs.

SAP calculations can usually be completed remotely from suitable drawings and specifications. The more complete the information, the faster the result.
Missing details? We'll tell you exactly what's needed, or use sensible design assumptions and flag them clearly.
Part L is devolved, so we assess each project against the rules for its location.
New homes and conversions are assessed against the Welsh Approved Document L. The Welsh Government consulted on a review of Part L in 2025, and we keep you informed if a change affects your project.
Cardiff, Newport, Swansea, Bridgend, the Vale of Glamorgan and the Valleys.
Bristol and Bath projects follow the English Approved Document L. The Future Homes Standard takes effect on 24 March 2027, with transitional arrangements for projects already submitted and started by set dates. We'll confirm which standard your project falls under.
Bristol, Bath and North East Somerset.
Calculations and On-Construction EPCs from a qualified On-Construction Domestic Energy Assessor.
We tell you at design stage if something won't pass, not after the walls are up.
When a design needs work, we model the options and recommend the most cost-effective change.
Design-stage SAP, as-built SAP and the EPC are handled by the same person.
We can arrange the air tightness test needed for the as-built stage.
Priced from your drawings, with the scope agreed before any work starts.
We are based in Cardiff. Design-stage work is done from drawings, so we can take on projects across South Wales and in Bristol and Bath.
We also work in Caerphilly, Barry, Penarth, Pontypridd, Merthyr Tydfil, Cwmbran, Monmouthshire and the surrounding Valleys.
Not always. Most extensions that meet the standard insulation values and keep windows, roof lights and doors within the glazing allowance (broadly 25% of the extension floor area, plus the area of any openings the extension covers) do not need one. If you go over that allowance, Building Control will usually ask for a calculation showing the extended home performs no worse than one built to the standard. A SAP comparison is the usual way to do that.
If the conversion creates a new dwelling, such as a barn, a commercial building or a house split into flats, the new home needs an EPC on completion. That is normally produced from a SAP calculation, and SAP is often the simplest way to show Part L compliance as well. A garage conversion that just adds a room to an existing house does not create a new dwelling and usually follows the standard insulation values instead. Your Building Control body will confirm the route for your project.
The design-stage SAP is produced from drawings before work starts and is submitted to Building Control with a Predicted Energy Assessment. The as-built SAP is updated at the end with the final specification and the air tightness test result, and is used to issue the On-Construction EPC.
We show you which changes would bring it into line, such as insulation thickness, window performance, heating system, ventilation or solar PV, and point out the most cost-effective option. It is far cheaper to adjust a drawing than a finished building.
Yes. SAP calculations are produced from drawings and specifications, so most of the work is done remotely. We cover South Wales and also take on projects in Bristol and Bath. We are based in Cardiff and do not have offices elsewhere.
Yes. Wales and England have separate Approved Documents for Part L with different targets, so a design that passes in one country will not automatically pass in the other. We assess every project against the rules that apply where it is being built.
Both depend on the number of dwellings, the complexity of the design and how complete the information is. We give you a fixed price and a timescale with your quote, and we tell you straight away if anything is missing so your Building Control submission is not held up.
Tell us about your build, conversion or extension and we'll confirm whether you need SAP, a fixed price and the timescale.
Prefer to write it down? Use the quote form below and we'll reply by email.